Golding Mackay Saves Up To 50% Using DAYWALK Frames Vs Custom Frames

Client
Golding
Date
July 25, 2025
Challenge
As a key player in the mining industry, Golding Mackay relies on the streamlined transportation of critical components to ensure continued growth and success. However, productivity was impacted due to a range of issues involved with the in-house fabrication of component transport frames.

These inefficiencies included:

  • In-house manufacturing limits time and resources for other projects
  • Transport solutions must meet stringent safety standards
  • Various components require different custom solutions 
  • Waiting for custom frames slows down operations
REAL COST OF IN-HOUSE MANUFACTURING

Costs involved with the delay of critical parts when managed with custom fabrication were significant. General estimations of asset downtime are as follows:

Estimated Cost Breakdown

Cost of delay due to custom fabrication with estimated 4-week (28 day) fabrication time

  • Per day: $108,000
  • Per 28 days: $3,024,000

 

The cost of in-house engineering was also significant, requiring a process of engineering sign-off, potential redesign and manufacture of the custom frames. The resources involved with in-house manufacturing, coupled with the delay in productivity, means that a solution was required for the component transport of items including final drives and cylinders.

IN STOCK TRANSPORT FRAME SOLUTION

DAYWALK addressed the key challenges of Golding Mackay with the supply of multiple Adjustable Transport Frame systems. These pre-engineered systems ticked all the boxes for Golding, providing a transport frame that was certified, adjustable and re-usable. 

Products supplied included Final Drive Frames, Cylinder Frames and Mesh Pallets, with rubber matting and accessories .As these are all in stock items at DAYWALK, they were available for dispatch within 48-72 hours. This provides a rapid timeline, within minimum delay, when compared with the previous in-house 4-week fabrication time estimate.

DAYWALK’s in stock frames benefits include:

  • Adjustability – allowing the versatile transport systems to be re-used for other suitable components
  • Fast dispatch – in stock solution saving 3.5 weeks when compared with in-house fabrication
  • Ready-made solution – allowing engineering teams at Golding to focus on high-value projects
  • Compliance – already engineered and certified, the frames are ready to go to site

Final Drive Frames ready for dispatch to Golding.

Multiple sizes of steel pallets with anti-slip mats and accessories ready for dispatch to Golding.

An overall look of Cylinder Frames, Steel Pallets and Final Drive Frames for the Golding order.

COST COMPARISON: DAYWALK VS IN-HOUSE FRAMES
Golding Stock Frames  
CategoryDAYWALK Adjustable Transport FrameCustom Fabricated Frame (4 Weeks)
AvailabilityIn stock, dispatch 48–72 hrs4-week fabrication time
Asset Downtime0–2 days28 days
Daily Downtime Cost (Curragh-adjusted)≈ AU$108,000/day [dpfguys.com]≈ AU$108,000/day [dpfguys.com]
Total Downtime Cost≈ AU$0–216,000≈ AU$3,024,000
Frame CostAU$15,000–$20,000AU$18,000–$26,000
Compliance / EngineeringFully engineered & certifiedRequires engineering sign-off, possible redesign
FlexibilityMulti-use, adjustable for asset variationsSingle-use, built for one component
Operational ImpactTransport immediately → minimal disruptionSignificant production/maintenance delays
Risk ProfileLowMedium–High
Total Financial Impact (Frame + Downtime)≈ AU$15,000–236,000≈ AU$3,042,000
Net Savings Using DAYWALK≈ AU$2.8–3.0 million saved
RESULT

Ensuring increased productivity, better budgeting and more efficient operations, these pre-engineered Adjustable Frames provide a range of benefits for heavy industry. As they are engineered by our specialist team and built to meet all relevant transport certifications, they are a reliable and compliant solution for industries on the go. 

The transport system’s unique flexibility in design allows for various sized and shaped components to be moved, enabling increased efficiency and smarter financial planning.

Golding Mackay effectively saved up to 50% using DAYWALK’s in stock transport frames instead of custom fabricated frames.

KEEP CRITICAL COMPONENTS MOVING

The mining industry can trust DAYWALK to provide the largest range of in stock transport frames in Australia. Our team has the know-how and experience to help you control costs and negate operational challenges. Find out more about our adjustable frames here or call 1300 662 987 to speak with our team today.

Contact Us
Daywalk’s 20 years of expertise make sure that your large, difficult, heavy and awkward items are transported with the assurance of certification and support. View the full range of Daywalk products here today and don’t hesitate to get in touch and speak directly with our team on 1300 662 987 or fill out the contact form and we will get back to you.