Home Resource Hub Case Studies

Our Case Studies

Latest Case Study
June 8, 2026

Timber Pallet Breakdowns Causing Downtime Mission-Critical Ops Could No Longer Afford

Components were critical to operational readiness, but transport-related damage and handling risks caused costly downtime. We recommended steel pallets instead.
June 3, 2026
Case Study
When power is down, everything stops. So, when a large electrical provider was seeking a tailored, storage and transport solution for a critical component, DAYWALK...
June 3, 2026
Case Study
A prominent mining vendor partnered with DAYWALK to solve issues with inhouse frames, opting for economical, in-stock standard frames to keep every part moving....
May 11, 2026
Case Study
Our client had sustained damage to propellors during component transport, resulting in high repair costs, unforeseen delays and critical equipment grounded....
April 2, 2026
Case Study
Crankshafts may be the foundation of an engine, but transportation is a challenging process. Our client required a solution to store and transport crankshafts....
March 20, 2026
Case Study
Crankshafts may be the foundation of an engine, but transportation is a challenging process. Our client required a solution to store and transport crankshafts....
March 20, 2026
Case Study
Engine blocks are vital for operations, so when there’s a delay, it means costly downtime. Workshop operations slow. The solution: DAYWALK Xyphos steel pallets....