Improving Capacity & Compliance with Multi-Level Component Storage

Effective Component Management

overflowing component storage
Client
Australian mining company
Date
November 12, 2026
CHALLENGE
A heavy equipment operation needed a safer, more practical way to store large final drives. Its existing dual-standard racking was rated to 7,000kg but had failed in application despite being certified. The team was reluctant to use the racks at their full rated capacity, limiting available storage and making heavy components harder to manage.
HEAVY DUTY COMPONENT STORAGE SOLUTION

DAYWALK supplied a three-level Stor-Rak Multi-Level Component Storage System, engineered for heavy industrial components. The system makes better use of vertical space without relying on conventional fixed racking.

 

“Stor-Rak is rated at 14T UDL WLL per level, with 26T on the base level. It’s engineered specifically for heavy component storage, designed with a minimal footprint.”

– Sam Poikayil, Principal Engineer for DAYWALK

HANDOVER AND ENGINEERING REVIEW

The system was delivered in late 2026. DAYWALK engineers and Technical Consultants attended site for the handover, working with the warehouse, engineering and HSE teams to explain the design, capacity and practical use of the system.

DAYWALK provided the engineering calculation basis for independent review, so the customer’s engineering team could assess the design and complete its own calculations as required.

DOCUMENTATION FOR SAFE OPERATION

The handover included the documentation needed to support safe use and ongoing inspection:

  • User and Assembly Guide: assembly instructions and safe-use guidance
  • Loading Plaques: clearly stated safe working unit loads
  • Technical Datasheet: product specifications and supporting pre-calculations
  • Routine Inspection Checklist: guidance for regular operational inspections
  • Annual Third-Party Inspection Checklist: requirements for independent structural inspections
An array of parts on timber pallets outdoors at a mining site

Solving challenges of component storage. Pre-engineered, the Stor-rak system is available in 2 or 3 level kits.

DAYWALK Stor-Rak multi-level storage system in a warehouse, featuring heavy-duty steel shelving with multiple storage levels and components stored on pallets. Customers and DAYWALK staff stand beside the structure, providing a sense of scale and demonstrating the system’s large storage capacity and practical use for industrial component storage.

This storage was developed to meet industry challenges, offering a huge working load limit each level, with 26T UDL base and 14T each level.

Contact Us
The warehouse, engineering, HSE and management teams responded positively to the system’s capacity and practical design. The handover addressed the technical and operational questions raised, with no outstanding engineering or product queries. The customer also identified potential to install additional Stor-Rak units across its yard, creating more capacity for heavy component storage. If you’d like to address your component storage challenges, get in touch with the DAYWALK team for our pre-engineered solutions.