Home Resource Hub Case Studies

Our Case Studies

Latest Case Study
November 20, 2025

How Mega Miners Avoid Up To $400k in Downtime with DAYWALK’s Container Solutions

OEM engaged our projects team to design and supply a 20ft container solution, purpose-built to safely and efficiently transport critical service materials to and from site during shutdowns.
October 1, 2025
Case Study

TIMBER PALLET NOT FIT FOR PURPOSE The pump arrived on a non-compliant timber pallet. The pallet was completely unsuitable for the large pump, and proved...

July 1, 2025
Case Study
A mining company powers towards increased reliability and efficiency with a DAYWALK custom crane-liftable solution to protect and transport a high-value asset....
June 30, 2025
Case Study
BHP faced increasing concerns over safety and efficiency with their existing zinc-plated cages, which were prone to rusting, bending, and tipping, leading to potential accidents...
May 19, 2025
Case Study
A prominent player in the Australian mining industry faced challenges in the safe, efficient transport of the CAT C18 Engine. We examine issues and innovations....
May 19, 2025
Case Study
A leading player in the industrial sector faced challenges managing workshop storage. With a growing volume of work, the existing storage had to be optimised....
April 29, 2025
Case Study
BHP project faced significant challenges regarding the transportation and preservation of Siemens 1.067m gauge bogie sets intended for BMA locomotives....