Home Resource Hub Case Studies

Our Case Studies

Latest Case Study
September 4, 2025

From Risk to Reliability: Custom Crane-liftable Solution

FMG faced a critical logistics issue: they lacked a safe, compliant, and reliable method to transport high-value alternators off-site for repairs. The absence of a purpose-built solution posed risks to both asset integrity and operational timelines.
July 25, 2025
Case Study
Golding encounters various challenges that can hinder productivity, including the need for adjustable frames that accommodate different components without custom solutions. Long lead times for...
June 30, 2025
Case Study
BHP faced increasing concerns over safety and efficiency with their existing zinc-plated cages, which were prone to rusting, bending, and tipping, leading to potential accidents...
May 19, 2025
Case Study
WesTrac, a prominent player in the mining industry, faced significant challenges in the safe and efficient transportation of a CAT C18 Engine. This case study...
May 19, 2025
Case Study
Metso, a leading player in the industrial sector, faced significant challenges in managing their workshop storage. With a growing volume of work, the existing storage...
April 29, 2025
Case Study
BHP project faced significant challenges regarding the transportation and preservation of Siemens 1.067m gauge bogie sets intended for BMA locomotives....
April 17, 2025
Case Study
Fortescue were looking to find durable and weatherproof storage systems, they found the DAYWALK Secure-A-Move Sheeted Cages....