Our Case Studies

Latest Case Study
July 25, 2025

Transforming Efficiency with Adjustable Transport Frames

Golding encounters various challenges that can hinder productivity, including the need for adjustable frames that accommodate different components without custom solutions. Long lead times for custom frames can stall operations, while in-house fabrication diverts time and resources from core activities. Additionally, companies must ensure that all transport solutions comply with industry standards. Addressing these challenges is essential for enhancing operational efficiency.
June 30, 2025
Case Study
BHP faced increasing concerns over safety and efficiency with their existing zinc-plated cages, which were prone to rusting, bending, and tipping, leading to potential accidents...
May 19, 2025
Case Study
WesTrac, a prominent player in the mining industry, faced significant challenges in the safe and efficient transportation of a CAT C18 Engine. This case study...
May 19, 2025
Case Study
Metso, a leading player in the industrial sector, faced significant challenges in managing their workshop storage. With a growing volume of work, the existing storage...
April 29, 2025
Case Study
BHP project faced significant challenges regarding the transportation and preservation of Siemens 1.067m gauge bogie sets intended for BMA locomotives....
April 17, 2025
Case Study
Fortescue were looking to find durable and weatherproof storage systems, they found the DAYWALK Secure-A-Move Sheeted Cages....
April 14, 2025
Case Study
RIO TINTO were looking to solve their on-going challenges of OH&S concerns, inefficiencies, and operational inconsistencies across sites....