Home Resource Hub Case Studies

Our Case Studies

Latest Case Study
April 14, 2026

Certified Transport Solution Propels $100,000s in Savings for Critical Component

Our client had sustained damage to propellors during component transport, resulting in high repair costs, unforeseen delays and critical equipment grounded.
April 2, 2026
Case Study
Crankshafts may be the foundation of an engine, but transportation is a challenging process. Our client required a solution to store and transport crankshafts....
March 20, 2026
Case Study
Crankshafts may be the foundation of an engine, but transportation is a challenging process. Our client required a solution to store and transport crankshafts....
March 20, 2026
Case Study
Engine blocks are vital for operations, so when there’s a delay, it means costly downtime. Workshop operations slow. The solution: DAYWALK Xyphos steel pallets....
November 20, 2025
Case Study
OEM engaged our projects team to design and supply a 20ft container solution, purpose-built to safely and efficiently transport critical service materials to and from...
October 1, 2025
Case Study

TIMBER PALLET NOT FIT FOR PURPOSE The pump arrived on a non-compliant timber pallet. The pallet was completely unsuitable for the large pump, and proved...

July 1, 2025
Case Study
A mining company powers towards increased reliability and efficiency with a DAYWALK custom crane-liftable solution to protect and transport a high-value asset....