Home Resource Hub Case Studies

Case Studies

Latest Case Study
September 11, 2026

Replacing Failing Timber Pallets with Adjustable Pump Frames

When an Australian energy provided required engines to power operations, the transport of components became a key consideration. With multiple spare parts being moved between repair facilities and site, the efficiency of shutdown logistics operations became a key focus for our client.
August 24, 2026
Case Study
When an Australian energy provided required engines to power operations, the transport of components became a key consideration. With multiple spare parts being moved between...
August 3, 2026
Case Study
An Australian aluminium refinery required a safer and more reliable method for transporting and storing large heat exchangers. Previously, heat exchangers were being moved using...
July 24, 2026
Case Study
When the existing storage racks showed visible signs of age and deterioration, DAYWALK stepped in to engineer custom storage to help grow mining operations....
July 20, 2026
Case Study
As important and valuable assets in the grinding circuit, mill gearbox failures had the potential to result in significant downtime and lost revenue....
June 22, 2026
Case Study
A pump OEM supplying a critical pump package to a QLD mine site required a solution to protect the asset so it remained installation-ready when...
June 8, 2026
Case Study
Components were critical to operational readiness, but transport-related damage and handling risks caused costly downtime. We recommended steel pallets instead....