Home Resource Hub Case Studies

Our Case Studies

Latest Case Study
April 2, 2026

Shutdown Storage: Preventing Damage and Wait Times

Crankshafts may be the foundation of an engine, but transportation is a challenging process. Our client required a solution to store and transport crankshafts.
March 20, 2026
Case Study
Crankshafts may be the foundation of an engine, but transportation is a challenging process. Our client required a solution to store and transport crankshafts....
March 20, 2026
Case Study
Engine blocks are vital for operations, so when there’s a delay, it means costly downtime. Workshop operations slow. The solution: DAYWALK Xyphos steel pallets....
November 20, 2025
Case Study
OEM engaged our projects team to design and supply a 20ft container solution, purpose-built to safely and efficiently transport critical service materials to and from...
October 1, 2025
Case Study

TIMBER PALLET NOT FIT FOR PURPOSE The pump arrived on a non-compliant timber pallet. The pallet was completely unsuitable for the large pump, and proved...

July 1, 2025
Case Study
A mining company powers towards increased reliability and efficiency with a DAYWALK custom crane-liftable solution to protect and transport a high-value asset....
June 30, 2025
Case Study
BHP faced increasing concerns over safety and efficiency with their existing zinc-plated cages, which were prone to rusting, bending, and tipping, leading to potential accidents...