Home › Resource Hub › Case Studies

Case Studies

Latest Case Study
October 26, 2026

Maximising Space for Critical Mining Spares

Discover how vertical storage can help maximise warehouse space and organise critical mining spares, previously stored on floors or skids. Read the case study.
October 26, 2026
Case Study
When a crankshaft can cost $100,000 to replace, with damage creating a knock-on effect of decreased productivity, a custom DAYWALK storage box was required....
October 8, 2026
Case Study
A cylinder rebuild workshop was manufacturing their own frames in-house. While this gave them control over their supply, the process was taking valuable manufacturing time...
September 11, 2026
Case Study
At a mine site in Western Australia, heavy industrial pumps were being moved and stored on timber pallets. While timber pallets provided a readily available...
August 24, 2026
Case Study
When an Australian energy provided required engines to power operations, the transport of components became a key consideration. With multiple spare parts being moved between...
August 3, 2026
Case Study
An Australian aluminium refinery required a safer and more reliable method for transporting and storing large heat exchangers. Previously, heat exchangers were being moved using...
July 24, 2026
Case Study
When the existing storage racks showed visible signs of age and deterioration, DAYWALK stepped in to engineer custom storage to help grow mining operations....