1300 662 987
My Quote
0 items

Transporting Weir Rotors

With the Small Spartan Cylinder Frame.

Making component transport easy for the world!

CLIENT

Fortescue Iron Bridge

CHALLENGE

Transport of Weir Rotors for the Iron Bridge Project

Located in the Pilbara region of Western Australia, the Iron Bridge Project by Fortescue is being built to sustainably produce 22 million annual tonnes of Magnetite, a high-grade iron ore with lower impurities compared to hematite.

The Weir Rotors are a critical component of the high-pressure grinding essential for processing magnetite ore into high-grade iron ore concentrate. With safety and efficiency of the highest priority during transportation of these Rotors, they were delivered to us on unsafe wooden frames, ready to be given the DAYWALK treatment.

THE DAYWALK DIFFERENCE

Small Spartan Cylinder Frame

Safe, easy and certified DAYWALK Spartan 400 kg cylinder frames delivered the perfect solution for the Weir Rotors. Designed for world-class adjustability, functionality and safety when transporting cylindrical items, they fit onto our Small Spartan Cylinder Frames like a glove!

large industrial weir rotor

Adjustable End Stoppers provide a rubber lining specifically designed to prevent steel-on-steel contact.

weir rotors stored on crates in a warehouse

Adjustable Chocking System includes built-in ratchet securing
points.

WHY?

Logistics Engineered

Transport certification gives total peace of mind that you will meet your Chain of Responsibility (CoR) compliance requirements.

Forklift Safe

Load stability during movement and lifting reduces tipping and shifting to prevent accidents and damage to your equipment.

CONTACT

Every DAYWALK product is engineered on the basis of our core principle of making sure everyone gets home safe tonight. That’s the DAYWALK difference. Our certified range of transport options provides you with the most robust and long-lasting frame solutions available on the market today.