HEAVY DUTY COMPONENT STORAGE SOLUTION
DAYWALK supplied a three-level Stor-Rak Multi-Level Component Storage System, engineered for heavy industrial components. The system makes better use of vertical space without relying on conventional fixed racking.
“Stor-Rak is rated at 14T UDL WLL per level, with 26T on the base level. It’s engineered specifically for heavy component storage, designed with a minimal footprint.”
– Sam Poikayil, Principal Engineer for DAYWALK
HANDOVER AND ENGINEERING REVIEW
The system was delivered in late 2026. DAYWALK engineers and Technical Consultants attended site for the handover, working with the warehouse, engineering and HSE teams to explain the design, capacity and practical use of the system.
DAYWALK provided the engineering calculation basis for independent review, so the customer’s engineering team could assess the design and complete its own calculations as required.
DOCUMENTATION FOR SAFE OPERATION
The handover included the documentation needed to support safe use and ongoing inspection:
- User and Assembly Guide: assembly instructions and safe-use guidance
- Loading Plaques: clearly stated safe working unit loads
- Technical Datasheet: product specifications and supporting pre-calculations
- Routine Inspection Checklist: guidance for regular operational inspections
- Annual Third-Party Inspection Checklist: requirements for independent structural inspections

Solving challenges of component storage. Pre-engineered, the Stor-rak system is available in 2 or 3 level kits.

This storage was developed to meet industry challenges, offering a huge working load limit each level, with 26T UDL base and 14T each level.






