Speed of Delivery and Reducing OH&S Concerns

with Modular Timber-Based Cages for LINFOX / DEFENCE

CLIENT

LINFOX / DEFENCE

CHALLENGE

Efficiency, compatibility and risk

LINFOX / DEFENCE faced significant safety concerns due to outdated cage designs that posed OH&S risks and required frequent maintenance, resulting in delays and increased costs. The cages also hindered compatibility with their pallet racking and forklifts, affecting operational efficiency.

LINFOX / DEFENCE needed a comprehensive solution to enhance safety, streamline project timelines, and ensure the cages were durable and compatible with existing systems. Quick implementation was essential to minimize operational disruptions, and pre-assembled cages ready for immediate use upon delivery were a top priority.

SOLUTION
DAYWALK’s MODULAR CAGE SYSTEMS

After reviewing several options, LINFOX / DEFENCE decided to implement the DAYWALK VisionMod Premium Modular Cage Steel 800mmH, a state-of-the-art storage solution designed for safety and durability.

The implementation of the VisionMod Premium Modular Cage Steel 800mmH, proved to be an effective solution for the logistics company’s storage challenges. By investing in this innovative storage system, the company enhanced safety, improved operational efficiency, and achieved significant cost savings, positioning itself for future growth in a competitive market.

A significantly improved coating method has been developed, offering greater efficiency and durability compared to the coating techniques used in previous cage designs.

Daywalk pre-assembled the cages before delivery to expedite project execution once the cages arrived at LINFOX / DEFENCE.

WHY DAYWALK CAGES?

Best Application

DAYWALK were able to remove old cages from the LINFOX / DEFENCE network, which improves safety and reduces the risk of OH&S concerns with the previous coating.

Forklift and Racking Compatibility

Pallet racking compatibility & forklift safety improved across the LINFOX / DEFENCE network due to pallet base design, including suitable bottom boards.

Operational Efficiency

LINFOX / DEFENCE sought a comprehensive solution for durable, pre-assembled cages to streamline project timelines and ensure seamless integration with existing systems.

RESULT
Expertise Delivered: Design, Engineering, Manufacture and Project Management.

LINFOX / DEFENCE successfully implemented the changes within the tight timeframe, minimizing disruptions to their operations. By ensuring that the new cages were pre-assembled and ready for immediate use upon delivery, the client was able to maintain workflow continuity. The efficient execution of this plan not only met their urgent needs but also enhanced their overall operational efficiency, leading to increased productivity and satisfaction among their staff. The implementation of the improved coating method has led to positive outcomes, reinforcing our commitment to quality and customer satisfaction.

CONTACT

With over 20 years of expertise, DAYWALK ensures that your heavy and complex items are transported securely and in compliance with industry standards. Explore the full range of transport frames and pallets or contact our team on 1300 662 987 today.