Taking the pain out of heavy equipment transport
Fortescue Metals Group (FMG) had a delivery of an 8.5t pump urgently needed on site, which did not meet fit for transport standards.
Fortescue Metals Group (FMG) had a delivery of an 8.5t pump urgently needed on site, which did not meet fit for transport standards.
How a new solution from Daywalk now means that a large miner can safely transport small components. Newmont, the world’s largest gold mining company, at the Tanami Mine in the Northern Territory.
The client wanted to determine the best preservation method for its components – to reduce corrosion during storage and transport.
Originally employing Reactive Copper Technology, the company compared this option with Daywalk’s Volatile Corrosion Inhibitor (eVCI) solution, to see whether the eVCI technology represented an effective alternative to protect its components.
Existing timber storage pallets unsafe and not compliant. The demands of mining requires many warehouse operations to keep up with operational targets, therefore rendering some warehouses unsafe. Many heavy industry companies use pallet racking which consequently support timber pallets with components strapped to them.
Existing control valve timber shipping frames were unsafe and not compliant. Global flow control solutions company Samson had challenges with control valves being sent from site for repair on old, unrated timber frames. These timber frames were deemed unsafe for transport back to sites, due to a fear of noncompliance to Chain of Responsibility legislation. Samson needed a durable, compliant transport system that could safely transport serviced valves back to site, and be safely reused multiple times.
Managing and implementing CoR compliant transport practices. Industry leading mining and cement equipment supplier, FLSmidth, had a challenge around training their operators in CoR compliant transport methods for equipment being dispatched from their facilities. The company did not have a documented benchmark system as to what was acceptable and unacceptable for transport of their heavy equipment. With heavy penalties for breach of CoR laws, management was concerned about how to best approach and manage CoR obligations.
Complex & risky drive-assembly transportation process. The logistics division of world-renowned industrial-drive equipment manufacturer and distributor David Brown Santasalo, had a complex logistics challenge for drive assemblies. This required a sophisticated, yet universal system that would be able to restrain drive-assemblies with multiple base sizes and complexities.
Compatible cage design required within tight deadlines. Daywalk were approached by Cleanaway with a time-critical scope for the Queensland Container Deposit Scheme. The scheme, commencing on 1 November 2018, was initiated by the Queensland Government with a view to improving the sunshine state’s recycling efforts.
Maximising efficiency of warehouse storage. Consider close on half a million parts being shifted each week and the need to increase throughput. This was why Mackay Hastings Deering Parts Warehouse embarked on an upgrade project. Furthermore, their main object was to double their racking capacity within the existing facility.
Speak with our sales team online or by phone and get a quote today.
Brisbane
Perth
Maryborough
Mackay
California
Texas
Sign up for our newsletter to get the latest updates, exclusive offers, and expert insights delivered straight to your inbox.